Postponing means to set a follow-up time for a lead, that does NOT render the lead as "due" when the time is up.
Postpone a lead by selecting "after" in the follow-up type drop-down when setting a follow up time.
Postponing leads is a good way to schedule leads that does not need to be called exactly at the time of the follow-up, but just some time after that.